Completed Projects
This selection showcases projects delivered by Versemar across Spain. Each project reflects a rigorous technical approach focused on protecting the marine environment and meeting the most demanding environmental standards.
Preliminary Studies for Posidonia oceanica Meadows within the L’Albufera Natura 2000 Site
Compilation of historical distribution, current status, and key environmental parameters to assess the feasibility of restoration actions in L’Albufera (Natura 2000 Site).
Client: Dirección General de Medio Natural y de Evaluación Ambiental – Generalitat Valenciana
Date: 2022

Environmental Monitoring Plan (EMP) for the Submarine Outfall — Calp WWTP
Environmental monitoring of the submarine outfall from the Calp WWTP, tracking effluent, waters, sediments, organisms, and biocenoses.
Client: Ajuntament de Calp
Date: 2022–2025 (Ongoing)

Environmental Monitoring Plan for Dredging Works at the RAO9 Quay, Port of Santander
Environmental Monitoring Plan to assess impacts and establish control measures during dredging at the RAO9 dock.
Client: ROVER Maritime
Date: 2022

Bionomic Characterisation of Extraction Areas and Relocation of Materials Unsuitable for Beach Nourishment, and Physico-chemical Characterisation of Water Bodies
Identification and mapping of benthic communities, and physico-chemical analysis of sediments and waters in dredging and disposal areas.
Client: TYPSA
Date: 2021

Update to the Implementation of ROM 5.1-13 on Coastal Water Quality in Port Areas — Port of Seville
Application of the ROM 5.1-13 standard through assessment of coastal water quality in the port area.
Client: Port Authority of Seville
Date: 2023

Environmental Monitoring Plan for Refurbishment of the Tabarca Island WWTP and the Submarine Pipeline between the Island and the Mainland Coast
Monitoring program for the refurbishment of the Tabarca island WWTP and the submarine pipeline to the mainland, including structural inspection and assessment of impacts on Posidonia oceanica meadows.
Client: Global Omnium
Date: 2024

Bionomic Mapping of s’Estany des Peix and Sa Torreta (Ses Salines Natural Park)
Bionomic mapping of benthic communities and seagrasses in s’Estany des Peix and sa Torreta within Ses Salines Natural Park.
Client: Conselleria de Medio Ambiente y Territorio, Govern de les Illes Balears
Date: 2021

Environmental Quality Monitoring of Marine Waters at the Port of Vilagarcía in Accordance with ROM 5.1-13
Sampling and physico-chemical, biological, and chemical analysis of water and sediments, following ROM 5.1-13 criteria and applicable regulations.
Client: Port Authority of Vilagarcía de Arousa
Date: 2021–2024

Maintenance Dredging of the Entrance Channel at Siles Marina (Canet d’en Berenguer)
Environmental monitoring during dredging operations through water, sediment, and benthos sampling, with physico-chemical and microbiological analyses.
Client: Club Nàutic Canet d’en Berenguer
Date: 2020–2025 (Ongoing)

Underwater Noise Control Service for the Saler and Garrofera Beach Regeneration Works (Valencia)
Measurement of underwater noise with hydrophones during dredging and beach-nourishment phases of the beach-regeneration project.
Client: TRAGSATEC
Date: 2023

Environmental Monitoring Plan for the Discharge from the Submarine Outfall of Treated Urban Wastewater — Oliva WWTP
Environmental Monitoring Plan (EMP) for the marine outfall discharge of treated wastewater from the Oliva Wastewater Treatment Plant (WWTP).
Client: Ajuntament d’Oliva
Date: 2020–2024

Control and Monitoring Service of the Receiving Environment for the Wastewater Discharge of the Txingudi Services Consortium
Monitoring of water, sediments, and organisms affected by the discharge from the Atalerreka Wastewater Treatment Plant (WWTP).
Client: Mancomunidad de Servicios de Txingudi
Date: 2021–2024

